The electric heating fusion sleeve is a special connecting pipe fitting that is compounded with a special electric heating network on a PE plate through secondary processing. It is mainly used for the interface connection of thermal pipelines, oil pipelines, natural gas pipelines, and anti-corrosion insulation pipelines. According to the different use scales of electric heating melt tape/electric heating fusion sleeve, it can be divided into the following three types: 1. Electric heating melt tape for hollow wall winding pipes; 2. Special electric heating melt tape for steel strip reinforced spiral corrugated pipes; 3. Special electric heating melt tape for prefabricated directly buried insulated pipes. Electric heating fuse.
Detailed precautions for the construction and use of electric heating fusion sleeves
1. Check the pipe and heating fuse for damage.
2. Align pipes and remove debris
3. Place the connected pipes 20-30cm above the ground through horizontal poles or sandbags (pipes can be placed directly on the foundation if there are operating grooves dug in the foundation), and align them horizontally.
4. Use a cloth to completely remove debris (including water vapor) from the outer surface of the pipe and the inner wall of the electric heating fuse. Oily dirt can be wiped away.
5. Tighten it with a locking device so that the electric heating tape and the pipe wall are tightly together. The edge of the strap should be aligned with the edge of the welding piece. (Steel straps and U-shaped clamps can also be used)
6. Connect the clamp at the output line end of the electric fusion welding machine to the connecting wire of the electric heating fuse sleeve.
7. Set the time and current level on the electric fusion welding machine, and perform welding according to the operating procedures of the hot fusion welding machine. At the end of the welding time, remove the connecting wire clamp and tighten the clamp again for about 1/4~1/2 turn.
8. At the end of the welding time, the buzzer sounds, the power is automatically disconnected, and the cooling time begins. With the wiring disconnected and the steel buckles and clamps tightened, the cooling time is generally 20 minutes in summer and 10 minutes in winter.
9. After a certain cooling time, open the steel buckle and observe the welding condition.






