PE automatic hot melt welding machine process steps

Dec 11, 2021

Material preparation: Pipes and fittings should be selected according to the construction requirements with matching equal-diameter, reducing elbows and tees. PE automatic hot-melt welding machine should use pipe fittings of the same brand and material. Welding between pipe fittings of different brands and materials with similar performance should be tested first.

 

Clamp the pipe: Use a clean cloth to remove the dirt on the ends of the two pipes. Place the pipe in the rack slips, replace the basic fixture according to the pipe fittings to be welded, and select the appropriate slips so that the lengths of the two ends of the butt joint are roughly equal and should be as short as possible while meeting the requirements of milling and heating . The part of the pipe outside the PE automatic hot-melt welding frame is held up with a support frame, so that the pipe axis is at the same height as the center line of the frame, and then fastened with slips.

 

Cutting: Insert the milling cutter, then slowly close the welding ends of the two pipes, and apply appropriate pressure until continuous chips appear on both ends. Remove the pressure, wait a while, and then exit the movable frame. The chip thickness should be 0.5~1.0mm to ensure that the impurities and oxide layers on the end faces of the welded pipe sections are cut, and the two butt joint end faces are smooth and clean.


Centering: The wrong side of the two pairs of welded pipe sections should be as small as possible. If the wrong side is large, it will cause stress concentration, and the wrong side should not exceed 10% of the wall thickness.

 

Heating: After the temperature of the heating plate reaches the set value, put it into the rack and apply pressure until the smaller curled edges on both sides reach the specified width, the pressure is reduced to the specified value to absorb heat. Ensure that there is enough molten material to prepare for the mutual diffusion of molecules during melting and docking.

 

Switching: The period from the end of heating to the beginning of the fusion docking is the switching period. To ensure the quality of the fusion docking, the shorter the switching period, the better.

 

Fusion butt joint: It is the key to welding. The fusion butt joint process should always be carried out under the melting pressure.

 

PE automatic hot melt welding machine cooling: due to the poor thermal conductivity of plastic materials, the cooling rate is correspondingly slow. The shrinkage of the weld material and the formation of the structure proceed at a slow speed over a long period of time. Therefore, the cooling of the weld must be carried out under a certain pressure.