How to use hot melt butt welding machine is required

Dec 16, 2021

Before using the hot-melt butt welding machine, it is necessary to make welding preparations, mainly to check whether the condition of the welding machine meets the working requirements. Then put the slips with the same pipe specifications into the rack; set the heating plate temperature to the welding temperature. Before heating, use soft paper or cloth dipped in alcohol to wipe the surface of the heating plate, but be careful not to scratch the PTFE anti-adhesive layer.


The welding of the hot melt butt welding machine should be operated in accordance with the parameters of the welding process card. When necessary, it should be adjusted appropriately according to changes in weather and ambient temperature. Use a clean cloth to remove the dirt on the ends of the two pipes, and place them in the frame slips so that the lengths of the two ends are equal. If necessary, the parts other than the pipe rack should be held up with a support so that the axis of the pipe is at the same height as the center line of the rack, and then fastened with slips.


Insert the milling cutter, first turn on the power switch of the milling cutter, and then slowly close the welding ends of the two pipes, and apply appropriate pressure until continuous chips appear at both ends. Remove the pressure, wait a moment, and then exit the movable frame, and close it. Power off the milling cutter. The chip thickness should be 0.5~1.0mm, and the chip thickness can be adjusted by adjusting the height of the milling blade.


Take out the milling cutter, close the two pipe ends, and check the alignment of the two ends. The amount of misalignment at both ends of the pipe should not exceed 10% of the pipe wall thickness or 1mm, whichever is greater. It can be corrected to a certain extent by adjusting the straightness of the pipe and the elastic slip; there is no obvious gap between the two ends of the pipe when closing. If the above requirements are not met, milling should be performed again until the above requirements are met.


Measure the drag force, this pressure should be superimposed on the process parameter pressure to get the actual pressure. And check whether the temperature of the heating plate reaches the set value. After the temperature of the heating plate reaches the set value, it is placed in the rack and the specified pressure is applied until the pressure on both sides reaches the specified width and the pressure is reduced to the specified value to absorb heat.


When the time is up, retreat the movable rack, quickly take out the heating plate, and then close the two pipe ends. The switching time should be as short as possible and cannot exceed the specified value. After cooling down to the specified time, release the pressure, loosen the slips, and take out the connected pipe.