1. Preparation
Cut off the power supply of the welding machine and make sure that the power plug has been unplugged from the socket to avoid the risk of electric shock.
Prepare the required tools, such as screwdrivers, wrenches, etc., and the new heating plate. The new heating plate should match the model of the welding machine.
2. Remove the old heating plate
Open the protective cover or housing of the heating plate of the welding machine, usually you need to use a screwdriver to unscrew the fixing screws or loosen the buckle.
Find the wire connector connected to the heating plate, carefully pull out or unscrew the wire connector, and remember the connection position of the wire or mark it so that the new heating plate can be connected correctly when it is installed.
Loosen the screws or clamps that fix the heating plate and remove the old heating plate from the welding machine. Some heating plates may be fixed by card slots or other methods, and corresponding disassembly operations need to be performed according to the specific structure.
3. Install the new heating plate
Place the new heating plate in the position of the original heating plate to ensure that it is firmly installed and accurately positioned. If the heating plate has slots or locating holes, make sure they fit correctly with the corresponding parts on the welding machine.
Connect the wire connector to the new heating plate according to the previously recorded markings or connection methods, making sure the connection is firm and avoid looseness or poor contact.
Tighten the screws or clamps that fix the heating plate to fix the heating plate. Then check whether the heating plate is installed smoothly and whether there is any shaking or tilting.
4. Test and adjust
After installation, close the heating plate protective cover or housing, plug the power plug back into the socket, and turn on the power.
Turn on the welding machine, set the appropriate heating temperature and time parameters, and let the heating plate preheat for a while.
Use a temperature measurement tool (such as an infrared thermometer) to check whether the temperature distribution on the surface of the heating plate is uniform and whether the temperature can accurately reach the set value. If the temperature is uneven or inaccurate, it may be necessary to further check the wire connection, temperature sensor and other components, or adjust and calibrate the temperature parameters of the welding machine.







