I. Pre-operation Preparation
Equipment Inspection: Confirm that the power cord and cable are undamaged and that grounding is reliable.
Protective Equipment: Insulating gloves, safety glasses, and a face mask must be worn.
Environmental Requirements: Keep the site dry and well-ventilated, away from flammable materials.
II. Precautions During Operation
Power Management: Always disconnect the power before moving the welding machine. Outdoor operation is prohibited in rainy weather.
Standard Operation: Connect the power supply first, and begin welding only after the equipment has stabilized.
Special Environments: In humid environments, strengthen insulation and avoid prolonged overload.
III. Post-operation Handling
Site Cleanup: Clean up welding slag promptly and check for any remaining embers.
Equipment Maintenance: Clean the heating plate regularly and check the hydraulic system.
IV. Emergency Handling
Electric Shock First Aid: Immediately disconnect the power and follow the emergency plan for rescue.
Fire Response: Stop work, call 119, and report to the person in charge.