What are the safety precautions for using a socket fusion welding machine?

Jan 30, 2026

I. Pre-operation Preparation

Equipment Inspection: Confirm that the power cord and cable are undamaged and that grounding is reliable.

Protective Equipment: Insulating gloves, safety glasses, and a face mask must be worn.

Environmental Requirements: Keep the site dry and well-ventilated, away from flammable materials.

II. Precautions During Operation

Power Management: Always disconnect the power before moving the welding machine. Outdoor operation is prohibited in rainy weather.

Standard Operation: Connect the power supply first, and begin welding only after the equipment has stabilized.

Special Environments: In humid environments, strengthen insulation and avoid prolonged overload.

III. Post-operation Handling

Site Cleanup: Clean up welding slag promptly and check for any remaining embers.

Equipment Maintenance: Clean the heating plate regularly and check the hydraulic system.

IV. Emergency Handling

Electric Shock First Aid: Immediately disconnect the power and follow the emergency plan for rescue.

Fire Response: Stop work, call 119, and report to the person in charge.