Butt Welding Machine to the Operator Two sizes of new Butt Welding machines shall be supplied to the contract that will remain with the Employer after completion of the works, name
If planing tool of pipe welding machine does not rotate , how to fix? Problem: The limit switch is ineffective or the mechanical parts of planing tool are clipped. Solution:Replace
How to adjust the deviation between heating plate and temperature controller 1. When temperature controller is stable, it reads 220 degrees 2. Test the heating plate, and the avera
pe pipe butt fusion machine welding standard Because of difference in welding standard and PE material, the time and pressure vary in different phases of welding. It suggests that
Maintenance & Inspection
Heating plate operation for butt welding machine hdpe pipes Clear the dust or slit on the surface of heating plate (Caution: Don’t damage PTFE layer on the surface of heating plate
Planing Open the pipes/fittings ends after turning swing check valve anti-clockwise to the end. Put the planning tool between the pipes/fittings ends and switch it on, close the pi
Adjust the pressure Open fully the pressure regulation valve completely, lock the swing check valve tightly and then push forward the direction valve meanwhile adjust the pressure
Welding quality Malfunctions Analyzing and Solutions