Wuxi Shunda Plastic Pipes Welding Machine Co., Ltd.
+86-510-83292458

How to use pe hot melt machine

Nov 24, 2021

1. Preparation, prepare the pe pipe hot-melt welding machine, including hydraulic station, milling cutter, heating plate and other related power sources, and place the docking frame steadily;


2. Placement: Place the two pe pipes that need to be welded in the docking frame, and connect and dispose of them in the middle of the four clamps of the docking frame.


3. Fix, close the upper and lower brackets of the docking frame, and fix the pe tube with bolts.


4. For milling, take the milling cutter out of the basket and place it in the middle of the two pe pipes, push the operating lever of the hydraulic station, and contact the two pe pipes with the milling cutter until the two connecting planes are milled, and a continuous long strip shape is milled Crumbs.


5. Alignment, because the fixed pipe may be offset during milling, you must realign and adjust the amount of misalignment. Of course, you must also be careful not to contaminate the port, otherwise you must mill again.


6. Heating, put the milling cutter back into the basket, and take the heating plate out of the basket and put it in the middle of the two PE tubes for heating. After the two tubes start to flanging and meet the requirements, put it back on the heating plate.


7. After welding, after taking out the hot plate, immediately close the PE port to be welded according to the required pressure.


8. Cooling is complete.