With the launch of key projects such as the national West-East Gas Transmission, polyethylene-PE (polyethylene) pipelines have become increasingly widely used. Currently, this product has been widely used in gas, natural gas, water supply and other fields.
PE pipelines have the characteristics of easy construction, fast speed, corrosion resistance, no pollution, and long service life. There are two main methods for connecting PE pipes: hot melt welding machine connection and hot melt welding machine connection. At present, main pipelines are mainly connected using hot melt welding machines. The connection principle of the hot melt welding machine is to place the mating surfaces of two PE pipes close to the heating tool to heat the flat end faces until they melt. After removing the heating tool, the two molten end faces are brought close together. Under the action of pressure Keep it down until the joint cools and becomes a unit.
1. Welding preparation. Preparation work for hot melt welding machine welding construction is as follows:
①Insert the slips with the same specifications as the pipe into the frame;
② Prepare enough supports to ensure that the pipe to be welded can be at the same height as the center line of the frame and can be moved easily;
③Set the heating plate temperature to 200~230℃;
④ Turn on the power of the hot melt welding machine, turn on the heating plate, milling cutter and oil pump switches and test run.
2. Welding. The welding process of the hot melt welding machine is as follows: Check the pipe and clean the pipe end→Tighten the pipe→Mill the pipe end with a milling cutter→Check the misalignment and gap of the pipe end→Heat the pipe and observe the minimum crimp height→Weld the pipe and cool it to the specified time→ Remove the tubing. During the welding process, the operator should refer to the parameters of the welding process card, and when necessary, make appropriate adjustments according to changes in weather, ambient temperature, etc.:
① Check whether the specifications and pressure level of the pipe to be welded are correct, and check whether there are bumps, bumps or scratches on the surface. If the depth of the scratch exceeds 10% of the wall thickness of the pipe, it should be partially removed before use;
② Use soft paper or cloth dipped in alcohol to remove oil stains or foreign matter on both ends of the pipes;
③Place the pipe to be welded in the slips of the frame so that the lengths protruding from both ends are equal (as short as possible without affecting milling and heating, preferably 20~30mm). The parts other than the pipe frame are used Hold up the support so that the axis of the pipe and the center line of the frame are at the same height, and then tighten them with slips;
④Insert the milling cutter, first turn on the power switch of the milling cutter, then close the two ends of the pipe and apply appropriate pressure until continuous chips appear at both ends (the chip thickness is 0.5~10mm). By adjusting the height of the milling blade Adjustable chip thickness), remove the pressure, wait for a moment, then withdraw the movable frame, and turn off the power of the milling cutter;
⑤ Take out the milling cutter, close the two pipe ends, and check the alignment of the two ends (the misalignment of the two ends of the pipe cannot exceed 10% of the wall thickness, which can be improved by adjusting the straightness of the pipe and elastic slips; the gap between the two ends of the pipe cannot exceed 0.3mm (below de225mm), 0.5mm (de225mm~400mm), 1mm (de400mm or above), if it does not meet the requirements, it should be milled here until it meets the requirements.
⑥After the temperature of the heating plate of the hot melt welding machine reaches the set value, put it into the frame and apply the specified pressure until the minimum curling edge on both sides reaches the specified height, and the pressure is reduced to the specified value (the space between the two sides of the pipe end and the heating plate is just right Keep in contact and absorb heat). After the time is up, release the movable frame, quickly take out the heating plate, and then close the two pipe ends. The switching time should be shortened as much as possible. After cooling to the specified time, release the pressure, release the slips, and take out the connection. Finished pipe.
3. Welding process parameters of hot melt welding machine The parameters directly related to welding are: temperature, time and pressure.