1. Pipe preparation:
Cut the pipe into a flat end face with a length error of no more than ±5mm.
Clean the end face of the pipe and the surrounding stains to ensure that the end face is clean and oil-free.
2. Pipe clamping:
Fix the pipe on the fixture to ensure that the pipe is aligned and has good coaxiality.
3. Milling end face:
Use a milling cutter to mill the end face of the pipe to ensure that the end face is flat and perpendicular to the axis of the pipe.
4. Heating:
Insert the heating plate between the end faces of the pipe and heat to the set temperature (usually 200℃~220℃).
The heating time is determined according to the pipe specifications and ambient temperature.
5. Heat absorption:
After reaching the molten state, remove the heating plate and let the end face of the pipe absorb heat under a certain pressure.
The heat absorption time is determined according to the pipe specifications.
6. Butt joint:
Butt the end faces of the pipe and apply a certain welding pressure.
The butt joint pressure is determined according to the pipe specifications and SDR value (standard dimension ratio).
7. Cooling:
Maintain the pressure and cool naturally to room temperature.
The cooling time is usually 2~3 times the welding time.







